Helion is expected to have its fusion generation device online by 2028 and to reach its target power generation of 50 megawatts or more within an agreed-upon one-year ramp up period. When the fusion device is fully up to speed producing 50 megawatts of energy, it will be able to power the equivalent of approximately 40,000 homes in Washington state.
While Helion’s deal with Microsoft is to get 50 megawatts online, the company eventually aims to produce a gigawatt of electricity, which is one billion watts, or 20 times the 50 megawatts it is selling to Microsoft.
Microsoft will pay for the megawatt hours of electricity as Helion delivers them to the grid.
technology
!technology@hexbear.net
On the road to fully automated luxury gay space communism.
Spreading Linux propaganda since 2020
- Ways to run Microsoft/Adobe and more on Linux
- The Ultimate FOSS Guide For Android
- Great libre software on Windows
- Hey you, the lib still using Chrome. Read this post!
Rules:
- 1. Obviously abide by the sitewide code of conduct. Bigotry will be met with an immediate ban
- 2. This community is about technology. Offtopic is permitted as long as it is kept in the comment sections
- 3. Although this is not /c/libre, FOSS related posting is tolerated, and even welcome in the case of effort posts
- 4. We believe technology should be liberating. As such, avoid promoting proprietary and/or bourgeois technology
- 5. Explanatory posts to correct the potential mistakes a comrade made in a post of their own are allowed, as long as they remain respectful
- 6. No crypto (Bitcoin, NFT, etc.) speculation, unless it is purely informative and not too cringe
- 7. Absolutely no tech bro shit. If you have a good opinion of Silicon Valley billionaires please manifest yourself so we can ban you.
Community stats
1.4K
Monthly active users
1.2K
Posts
13K
Comments