You are viewing a single thread.
View all comments View context
8 points

to put a 3 power day buffer in place

Hydro is used to smooth out peaks and troughs in the power supply. You’re not even close to getting a useful estimate.

The fifth largest hydroelectric power station in the UK is 160MW

100MW by 2030 is a pretty big deal.

permalink
report
parent
reply
4 points

I agree you need much less capacity because you’d usually just want to even out fluctuations, but I think the general gist of the comment is still true: you need just 2,5x the amount of water to produce the same amount of energy. The article says very little about the liquid, and very little about why this would enable them to build this capacity much quicker. A little more data would be nice.

permalink
report
parent
reply
-1 points

More information is alway s useful. But it’s pretty obviously quicker to build because it only needs to handle 40% of the liquid and it’s not on a mountain.

permalink
report
parent
reply
3 points

The article in this post is written by yet another dunce who doesn’t know the difference between energy and power. That single generating station would fill 100 MWh of capacity in 37.5 minutes.

permalink
report
parent
reply

Technology

!technology@lemmy.world

Create post

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


Community stats

  • 17K

    Monthly active users

  • 12K

    Posts

  • 554K

    Comments