45 points
*
Deleted by creator
permalink
report
reply
-3 points

So no actual cutting edge technology then. Thought so. Bye 5 billion.

permalink
report
parent
reply
28 points
*

5 billion dollars from the climate and transformation fund? Glad to see we’re really committed to using this money here to combat climate change by building semi conductor factories.

The greens have been an absolute joke in coalition. First Lüzerath and now siphoning funds from a climate fund to build parts for car production.

permalink
report
reply
33 points

Funny that not only conservatives and the right but also the left is blaming the Greens for everything. The KTF is used only because our finance minister is blocking spending money from other sources, same thing happened with Intel in Magdeburg. So if the economy ministry wants to support these companies, this is their only option.

permalink
report
parent
reply
-20 points

Everyone is dissatisfied with the greens but it’s everyone but the greens fault somehow. What’s the point of having them in coalition when this type of shit keeps happening despite them?

They could have blocked the destruction of a 250 year old forest in Hesse and they didn’t. They sat on the sidelines while cops kicked the shit out of climate protesters in Lüzerath. They’re a fucking joke. If the FDP finance minister wants to reject building chips for cars, then let him? Don’t let them use the KTF as a fucking slush fund.

permalink
report
parent
reply
17 points

Well, so better no progress at all? Don’t get me wrong, I am also discontent with the Greens , but between an actively sabotaging FDP and a SPD which seems to move to the spot the Union is leaving for the right: What are the options? Sit down, arms crossed and stare at each other? The Greens are at least trying to do something.

permalink
report
parent
reply
9 points

What are they supposed to do if other ministries work against them? They only have so much leverage in a three party coalition.

permalink
report
parent
reply
7 points
*
Deleted by creator
permalink
report
parent
reply
17 points

Well, one could argue local production reduces transportation, so that counts for something… right?

permalink
report
parent
reply
12 points

Wellllll it seems like the plant will be mainly for building car MCUs - so slightly counterintuitive, lol

permalink
report
parent
reply
11 points

Some genius will figure out that it’s 0.00000001€ cheaper to ship the dies to China for packaging.

permalink
report
parent
reply
6 points

genius MBA

permalink
report
parent
reply
2 points

it’s going to the Philippines usually 😉

permalink
report
parent
reply
15 points

5 billion dollars

Euros.

permalink
report
parent
reply
13 points

What else can you use the money from the climate and transformation fund for? Every sensible use is being blocked by the FDP. So use it for something that is necessary either way, rather than let it go to waste.

permalink
report
parent
reply
13 points

Keep in mind the KTF is not just purposed for climate, but also economic development in East germany. I would much prefer a chip factory in place of the current lignite industry.

permalink
report
parent
reply
25 points

This is the best summary I could come up with:


It has been in talks with the German state of Saxony, where Dresden is located, since 2021 about building a fabrication plant, or “fab.”

"With this TSMC investment, another global player in the semiconductor sector is coming to Germany.

This shows that Germany is an attractive and competitive location," German Economy Minister Robert Habeck said in a statement.

The chip giant said in its statement on Tuesday that it approved a capital injection of not more than $4.5 billion for that plant as part of the overall investment.

According to the business daily Handelsblatt, Germany has agreed to pitch in with 5 billion from the government’s climate and transformation fund for the construction.

The EU has already approved a €43 billion subsidy plan to double its chipmaking capacity by 2030.


I’m a bot and I’m open source!

permalink
report
reply
5 points

Looks like UNO reverse card and only took 30-35 years

permalink
report
reply
2 points

If they can’t get one staffed in Arizona, they are going to have a hell of a time doing it in Germany. They have much better worker protections.

permalink
report
reply
30 points

There’s been an AMD/GloFo fab in Dresden for decades.

permalink
report
parent
reply
8 points

Don’t forget Siemens/Infineon

permalink
report
parent
reply
5 points

And Bosch

permalink
report
parent
reply
6 points

Why would worker protection prevent staffing?

permalink
report
parent
reply

Europe

!europe@feddit.de

Create post

News/Interesting Stories/Beautiful Pictures from Europe 🇪🇺

(Current banner: Thunder mountain, Germany, 🇩🇪 ) Feel free to post submissions for banner pictures

Rules

(This list is obviously incomplete, but it will get expanded when necessary)

  1. Be nice to each other (e.g. No direct insults against each other);
  2. No racism, antisemitism, dehumanisation of minorities or glorification of National Socialism allowed;
  3. No posts linking to mis-information funded by foreign states or billionaires.

Also check out !yurop@lemm.ee

Community stats

  • 1

    Monthly active users

  • 3.2K

    Posts

  • 34K

    Comments

Community moderators