Off the Siberian coast, not far from Alaska, a Russian ship has been docked at port for four years. The Akademik Lomonosov, the world’s first floating nuclear power plant, sends energy to around 200,000 people on land using next-wave nuclear technology: small modular reactors.

This technology is also being used below sea level. Dozens of US submarines lurking in the depths of the world’s oceans are propelled by SMRs, as the compact reactors are known.

SMRs — which are smaller and less costly to build than traditional, large-scale reactors — are fast becoming the next great hope for a nuclear renaissance as the world scrambles to cut fossil fuels. And the US, Russia and China are battling for dominance to build and sell them.

39 points

One of the less widely discussed issues with nuclear is that the bigger plants are all somewhat unique in their engineering particulars, which makes it more costly to maintain them. SMRs can be more readily standardised, which is expected to improve their economics as well as their cost to maintain.

permalink
report
reply
9 points

This is only partially true, France for example has standardized its reactors in the past, with a lot of success, and is planning to do it again for the new projects which are planned in the 2030s. Now it was done in the past with little care for local populations and so on, so we’ll see how it goes. What is true though is that standardization also makes sense when there is a repetitive market foreseen. New nuclear project tend to be announced in small numbers, due to the difficulty of investing so much capital at a time, which makes standardization difficult. Smaller reactors may help, but I remain sceptical with the tech.

permalink
report
parent
reply
8 points
*
Deleted by creator
permalink
report
parent
reply
2 points

I doubt it. Unless they have power storage of some kind, like SSR designs where they use a thermal battery of some kind.

The fundamental issue with nuclear power is that it produces a fixed output (which falls over time) which cannot be managed. Aside from just deleting what would otherwise be power (which is where the power storage comes into play)

It’s not impossible though, but then again it’s not impossible for any nuclear plant to store energy.

permalink
report
parent
reply
2 points

The small reactors on submarines can maneuver very quickly without causing fuel damage. Less power per core = less heat generation. Large reactors are limited by flux rate because they can have such high localized heating during maneuvering which has the potential to damage fuel. In that sense, SMRs could raise and lower power to meet demand or even operate on full power/standby basis like what gas plants offer during peak load.

I can’t speak to the strategy of an electric utility using SMRs, but to your point, I would think the idea would still be base load. Build a site with the potential for more SMRs to be built to meet demand in the future.

permalink
report
parent
reply
-2 points

Renewables being unable to do base load is just a myth that has been debunked countless times.

permalink
report
parent
reply
2 points

renewables can theoretically do baseload. The problem with renewables is that they don’t really have a good pairing with something that would make it SIGNIFICANTLY easier to do.

Nuclear and solar power would make a great pairing for summer time midday peak draws for example. Wind is a good supplementary source. Hydro is a good stored energy source.

You can definitely do full renewable but it will still inevitably be better complimented by some form of baseload plant (i.e. nuclear)

permalink
report
parent
reply
1 point

I’ve love for just one of the people anonymously downvoting to chime in. What you wrote is completely accurate but every nuclear-themed post here and on Reddit is downvoted without anyone putting forward a counter-argument.

permalink
report
parent
reply
4 points

Can we not standardize the big ones? Their only dependent factor is a big enough water source for cooling, right? Everything else is just land space and supplies.

permalink
report
parent
reply
7 points

I think the scale of the projects and the amount of time it takes to build gives people time to work things in to the plans. I also imagine it’s affected by the local supply chain.

That being said I’m more on the fence about them after reading about some of the challenges involved in making them economical. Can you imagine a factory recall on a reactor part? And that’s not even talking about nuclear waste disposal which we still haven’t figured out reliably beyond “stick it over there and hopefully it won’t be a problem for a few hundred years.”

permalink
report
parent
reply
5 points

They also depend on a final nuclear disposal site.

permalink
report
parent
reply
5 points

The construction projects themselves also typically require upgrades to local infrastructure. I live near the failed nuclear project in SC and they had to upgrade rail infrastructure near my town, they had to build multiple new bridges over the railroad because the clearance wasn’t high enough for some of the prefabricated components that had to be transported to the site by rail, etc.

permalink
report
parent
reply
2 points

Yes and no. Currently the rules around nuclear plants are so strict that each installation becomes bespoke, because small changes that are the reality of construction need to get reapproved.

If regulatory bodies were more open to approving acceptable ranges, or being proactive in the design process we could have more standardized designs.

permalink
report
parent
reply
1 point
*

I think one of the differences is where the construction happens. SMR should be able to come from the factory in more complete modules, vs assembling everything in the field. While it could never do the volume to make it mass production, in theory you could get similar benefits from automation, repetition, controlled environment, etc. Meanwhile site assembly should be corresponding simpler

permalink
report
parent
reply
1 point

you absolutely can, problem is it’s just as hard as doing it with SMRs if not harder lol.

permalink
report
parent
reply
-1 points

They have only one small drawback, which is that they’re nothing but vapourware.

permalink
report
parent
reply
1 point

Sadly! I’m not in this field but I had a professor at uni who was involved in these. I wish they were more prevalent

permalink
report
parent
reply
-2 points

And why do you think they’re not?

permalink
report
parent
reply
22 points

I’ve been following the situation in Canada. Afaik the closest we are to getting SMRs is a plan to supplement power production at the Darlington, Ontario CANDU plant using SMRs of the GE Hitachi design. The utility is seeking regulatory approval on the first of 4, but they haven’t broken ground yet to the best of my knowledge. Each would put out up to 300 Mw, so I guess the completed project would add 1.2 Gw to the grid.

Ontario gets around half its power from nuclear, and the current provincial government is gung-ho on building more capacity. While I am not opposed to the idea (they would need to build more anyway just to maintain that ratio in coming decades), the fact that it comes at the heels of them cancelling nearly every renewable energy project at the beginning of their term adds a sour note. These included those that were actually under construction, and tax money had to foot the bill on broken contracts. It was flabbergasting. I am cautiously optimistic about SMRs but they are still vapourware for the most part at this time.

permalink
report
reply
17 points
*

It’s a known tactic of the fossil fuel industry (and the politicians they own) to push SMRs as a delay tactic, so they can continue to make money from coal and gas for a bit longer. And conservative parties get to play culture war over it, which we know they love to do.

If something real comes out of it then great, but you can’t plan an energy transition based on a technology that isn’t proven yet.

permalink
report
parent
reply
9 points

Oh man, that is just depressing. I mean I wouldn’t put it past them. It’s like this whole business with carbon capture.

A couple of years ago, I was driving around the Permian Basin near Midland, Texas. I asked a local about all these gas flares you’d see. He said it’s waste natural gas. They’re drilling for oil, you see, so they just burn it off. When I looked incredulous, he added that it’s better than simply venting it. Methane is a potent greenhouse gas! Well sure, but…

Let’s just say it would take a lot to convince me at this point that the future is carbon capture.

permalink
report
parent
reply
2 points

That’s absolutely what’s going on here. the whole “nuclear renaissance” is nothing but a smoke screen.

permalink
report
parent
reply
2 points

It’s like this whole business with carbon capture.

Yep, it’s very similar to the CCS push from the 2000s. And you saw the Democratic party pushing it too, despite it fast becoming obvious that it’s not viable.

permalink
report
parent
reply
-5 points

That just shows that nuclear is nothing but a smokescreen for perpetuating fossil fuels. First they cancel the renewable projects because they have all those fancy new nukes now. Then the nukes never pan out (as they do). Oh shucks, guess we have to keep using coal.

permalink
report
parent
reply
6 points
*

That’s not quite accurate. All the coal power plants in Ontario were shut down about 5-ish years before. Then they had planned more renewable capacity. Then a new leader of the province came in to power (the brother of a famous crackhead mayor), spent money to cancel the projects not with anything to do with nuclear but out of spite of the previous Liberal government.

Second, you look to Germany whose nuclear power plants were shut down which forced them to reopen coal power plants. Yes renewables are coming in hot and it’s the future, but don’t get the timeline twisted just to shift blame on nuclear, especially in my native Ontario.

Indeed yes, the idea of using these technologies to distract from other green energies is a valid concern, but I’ll say that until we have fusion (that is always 20 years away from reality) it takes all kinds of green energy sources to transition.

permalink
report
parent
reply
12 points

the world’s first floating nuclear power plant

That’s a weird thing to say, considering we’ve had nuclear power plants inside submarines since 1958.

permalink
report
reply
5 points

Yeah, it’s pretty common for subs/ships at Pearl harbor to supply power back to the Hawaiian grid in the case of a blackout.

It honestly could be done at any naval base, but most of them would not be able to meet the needs of the larger urban areas they dock at.

permalink
report
parent
reply
3 points

Ah, but they’re not floating. They’re sinking, but controlled sinking.

permalink
report
parent
reply
6 points

The special thing about submarines isn’t that they can go underwater. It’s that they can come back up.

permalink
report
parent
reply
9 points

Yes, Soviet/Russian technology, the posterchild for prudence and carefulness.

permalink
report
reply
0 points

to be fair, it’s trivial to design a safe reactor, the RBMK just wasn’t a good design.

There is a paper out there on the presumed design of russian naval reactors if you want to have a read yourself. It’s decently informed.

permalink
report
parent
reply
7 points

The Akademik Lomonosov was supposed to cost the equivalent of $232M, but ended up somewhere north of $700M all for a net electrical output of 64MWe. In that respect, it follows a familiar path for nuclear projects.

On a cost/kW basis, it’s about three times the cost of wind installations. ($3625/kW vs $1300/kW)

The last co-gen plant I worked on had an output of 353MWe and cost about $450M, which was about $50M under budget.

permalink
report
reply
3 points

This misses one of the key points about smr’s. They’re supposed to be made in a factory. That ship is one unit and expensive as hell. If you make 100 or more of the same smr, you can amortize the tooling cost over many units. This also allows for configurable size stations. Right now, nuclear stations are one and done, custom jobs.

permalink
report
parent
reply
1 point

People keep saying this, but it’s not accurate.

An EPR is an EPR, the same with the AP1000. There are only very minor differences between installs, usually things that will help ease of construction or reliability on future builds. Both are GEN III+ designs, greatly simplified compared to previous generations, with fewer pump, valves and pipe-runs. They also shortened pipe runs where possible. They also have large, factory-built assemblies that are shipped to site, ready to “bolt” in, which should have reduced site construction time.

Where major changes do happen, it’s with the balance of plant infrastructure, which is site dependent. Location of access roads, where the switchyard is installed, where cooling water is accessed , etc will never be the same between sites. Nor will the geotech information. So a lot of mainly civil and structural design and fabrication will always be site specific.

The KLT-40S reactor is a variant of the KLT-40 reactors developed for and installed in the Taymyr icebreakers back in the late 1980s. It should have been cheap, as it’s a known quantity with a long track record.

permalink
report
parent
reply

News

!news@lemmy.world

Create post

Welcome to the News community!

Rules:

1. Be civil

Attack the argument, not the person. No racism/sexism/bigotry. Good faith argumentation only. This includes accusing another user of being a bot or paid actor. Trolling is uncivil and is grounds for removal and/or a community ban. Do not respond to rule-breaking content; report it and move on.


2. All posts should contain a source (url) that is as reliable and unbiased as possible and must only contain one link.

Obvious right or left wing sources will be removed at the mods discretion. We have an actively updated blocklist, which you can see here: https://lemmy.world/post/2246130 if you feel like any website is missing, contact the mods. Supporting links can be added in comments or posted seperately but not to the post body.


3. No bots, spam or self-promotion.

Only approved bots, which follow the guidelines for bots set by the instance, are allowed.


4. Post titles should be the same as the article used as source.

Posts which titles don’t match the source won’t be removed, but the autoMod will notify you, and if your title misrepresents the original article, the post will be deleted. If the site changed their headline, the bot might still contact you, just ignore it, we won’t delete your post.


5. Only recent news is allowed.

Posts must be news from the most recent 30 days.


6. All posts must be news articles.

No opinion pieces, Listicles, editorials or celebrity gossip is allowed. All posts will be judged on a case-by-case basis.


7. No duplicate posts.

If a source you used was already posted by someone else, the autoMod will leave a message. Please remove your post if the autoMod is correct. If the post that matches your post is very old, we refer you to rule 5.


8. Misinformation is prohibited.

Misinformation / propaganda is strictly prohibited. Any comment or post containing or linking to misinformation will be removed. If you feel that your post has been removed in error, credible sources must be provided.


9. No link shorteners.

The auto mod will contact you if a link shortener is detected, please delete your post if they are right.


10. Don't copy entire article in your post body

For copyright reasons, you are not allowed to copy an entire article into your post body. This is an instance wide rule, that is strictly enforced in this community.

Community stats

  • 14K

    Monthly active users

  • 20K

    Posts

  • 521K

    Comments