Meta has faced a setback in its plan to build data centers run on nuclear power. The FT reports that CEO Mark Zuckerberg told staff last week that the land it was planning to build a new data center on was discovered to be the home of a rare bee species, which would have complicated the building process.

14 points

BEES!

permalink
report
reply
5 points

THEY’RE IN MY EYES!!

permalink
report
parent
reply
4 points

Beads?

permalink
report
parent
reply
6 points

permalink
report
parent
reply
5 points

Not beads, BEES! RUN!

permalink
report
parent
reply
11 points

The bees come before his vanity projects.

permalink
report
reply
10 points

This project is full of bugs!

permalink
report
reply

Even if AI turns out to be a hype cycle, getting a lot of clean energy could make it worth the hassle.

It won’t.

Want to get to clean energy? Get a government with the guts to tell oil companies and car companies to get fucked.

And while they’re at it they can tell the purveyors of Grand Theft Autocorrect to get fucked as well.

permalink
report
reply
1 point

@ZDL same line bros used to greenwash crypto

permalink
report
parent
reply

Yep.

Better greenwashing: actually do green things.

permalink
report
parent
reply
0 points

@ZDL for some reason they think that’s too hard

permalink
report
parent
reply
5 points

I hope that after the bubble bursts the nuclear reactors can be used to put energy on the grid and maybe they’ll find something worthwhile to do with all those compute GPUs.

permalink
report
reply
0 points

There’s GOTTA be a way to combine liquid cooling of server racks and radiators for home heating

We use electricity to cool down one thing while we use electricity to heat up a different thing. Makes no sense.

permalink
report
parent
reply